Project Management and Advisory

We administer the contract on the principal’s or contractor’s behalf under GC21, MW21, AS 4000 or AS 4122 for all contract matters, including payment claims, variations, extensions of time, completion and defects.
Water main and booster pump station works, Gundagai
Form-Shape

Engineers who represent project owners

HTS acts for councils, water utilities and government as Owner’s Engineer, Principal’s Authorised Person and project manager. We take projects from funding and business case through procurement, delivery and close-out, protecting our clients on quality, time and cost.
We act as Owner’s Engineer, Principal’s Authorised Person and project manager, taking projects from funding and business case through procurement, delivery and close-out for clients.

Featured projects

Pump station and reservoir projects for councils and water boards, with scope and figures.

Our capabilities

Owner’s Engineer, contract administration, procurement, funding, approvals and asset management.
Precast concrete wall panels being installed on 5 ML reservoir, Cobar

Other experience

Telemetry, cathodic protection, ministerial briefings, licence applications and operational support.

Project management and advisory capability

We provide Owner’s Engineer services, contract administration, tender documentation, funding and business cases, approvals, land and regulatory support and asset management reviews.

worker

Owner's Engineer and Principal's Authorised Person

Independent design review, hold point and witness inspections, testing and commissioning oversight

Contract

Contract administration

GC21, MW21, AS 4000 and AS 4122; payment claims and Security of Payment Act schedules, variations, extensions of time, completion and defects
Document

Procurement and tender documentation

Technical specifications, tender packages and tender evaluation
Analysis

Funding, business cases and reporting

Business cases, options analysis, funding deeds, funding body reporting and ministerial briefings
Ok icon

Approvals, land and regulatory

Water access licences, works approvals, water sharing plans, EPA requirements, Crown land and compulsory acquisition, and Aboriginal land claims

Portfolio

Asset management and operational support

Asset management reviews, interim management, treatment plant operations support, critical control point reviews and insurance claims

Projects that prove our capability

Nyngan to Cobar Pipeline

Pump Stations Owner's Engineer

Client

Cobar Water Board

HTS role

Owner's Engineer

HTS is Owner’s Engineer for the future owner and operator on a $46M upgrade of Cobar’s raw water supply, comprising a new DN450 DICL transfer pipeline, two pump stations at Nyngan and the Hermidale high lift pump station. HTS reviews design across civil, mechanical, electrical and SCADA disciplines and manages interfaces with the existing operating system to keep supply uninterrupted

Key figures

$46M

project

3

pump stations

400–500 kW

Pumps

DN450 DICL transfer pipeline

Hermidale Pump Station Upgrade

Client

Cobar Water Board

HTS role

Principal's Authorised Person and project manager

Replacement of the booster station that lifts Bogan River water to Cobar and surrounding mines. HTS was appointed during delivery and brought the contract through testing, a 14-day continuous proving run, Completion and commercial close-out, with the station now operated remotely from CWB’s SCADA.

Key figures

1,000 kW

installed (4 × 250 kW pumps in two trains)

210 L/s

(about 18 ML/d)

3,500 kPa

tested to

4 sites

linked by telemetry

Fort Bourke 5 ML Concrete Reservoir, Cobar

Client

Cobar Shire Council

HTS role

Principal's Authorised Person under GC21 Design and Construct

A new post-tensioned concrete reservoir built beside the town’s 1960s tank, which stayed in service throughout. HTS developed the D&C technical specification, reviewed the contractor’s staged design, administered the contract and carried out hold point and watertightness inspections, so every issue was resolved before acceptance.

Key figures

5 ML

27 m diameter × 9.4 m wall

50-year design life

Euabalong Raw Water Pump Station

Design and Construct

Client

Cobar Shire Council

HTS role

Project manager and Principal's Authorised Person under MW21

A new Lachlan River pump station replacing an unsafe, unreliable intake and securing raw water for two townships. HTS administered the contract from inception to handover in about 8.5 months, including witness testing, and managed the compulsory acquisition of the Crown land site for Council.

Key figures

3 VSD

Pumps (N+1)

20 L/s

(about 1.7 ML/d)

25 m

Static lift

2

Townships

Why Choose Us

Senior registered engineers stay involved from start to finish, so clients deal directly with the people doing the design work.
Complaint

Independent review

Design review, hold point and witness inspections before any work is accepted.
Agreement paper

Contract expertise

GC21, MW21, AS 4000 and AS 4122 contracts.
Certified

Approvals knowledge

Water access licences, works approvals, EPA requirements and Crown land matters handled.
Analysis

Operating continuity

Interfaces with existing systems managed so supply stays uninterrupted during works.

Other project management and advisory experience

Telemetry upgrades

EPA pollution reduction plan responses

Cathodic protection system – project management

Water access licence and works approval applications

Valve replacement technical specification and tender package

Asset management reviews

Ministerial briefings

Interim management and treatment plant operations support

Insurance claims and funding deed management

Water main and booster pump station works, Murrurundi
Conduits laid in trench with warning tape

Frequently Asked Questions

Answers to questions about our project management and advisory services, from Owner’s Engineer roles to approvals, funding and contract administration.

An independent engineer acting for the asset owner. We review design, set inspection and hold point requirements, and oversee testing and commissioning.

We administer the contract on the principal's behalf under GC21, MW21, AS 4000 or AS 4122, including payment claims, variations and extensions of time, ensuring quality, compliance and dispute resolution, through to completion and defects.

Yes. We have been appointed during delivery and brought contracts through testing, completion and commercial close-out.

Yes. We prepare business cases and options analysis, manage funding deeds, complete funding body reporting and write ministerial briefings.

Yes. We handle water access licences, works approvals, water sharing plans, EPA requirements, Crown land, compulsory acquisition and Aboriginal land claims.

Yes. We provide asset management reviews, interim management, treatment plant operations support, critical control point reviews and insurance claims support.